RN: 101 Address: Baho Road, Sanchaung Township.
Year: 2012 Storey: 15
Company: Shwe Taung Co.,Ltd Building Type: Residential
Category: Status:
Design Status:
YCDC Letter Date
Load Test/Deep Ex/Foundation/Superstructure/MEP
Project Status
Architecture 1. Recommended old design on
( 4.6.2013).
2. YCDC letter for revised (28.4.2016).
3. Document checking is finished.
4. Recommended for Structure. (26.6.17)
Structure 1. Recommended old design on
( 4.6.2013).
2. YCDC letter for revised (28.4.2016).
3. Presentaion (28.5.2016).
4. Recommendation for revised design on (26.6.2017).
Electrical 1. Recommended old design on
( 4.6.2013).
2. Not submitted revised design drawing.
ACMV 1. Recommended old design on
( 4.6.2013).
2. Not submitted revised design drawing.
Water and Sanitation 1. Recommended old design on
( 4.6.2013).
2. YCDC letter for revised (28.4.2016).
3.Presentaion (17.7.2017).