SEA VIEW Condominium

RN: 214 Address: Myeik City.
Year: - Storey: 22 Storey + 28 Storey + 32 Storey
Company: Pyi Phyo Tun International Co.,Ltd. Building Type: -
Category: Status: -
Design Status:
Project Status
Architecture 1. Recommended Architectural Design.(8.2.18)
Structure 1. UPLT recommended. (9.5.2017)
2. Pilling recommended with method (3).(24.8.2017)
3. Structure Presentation. (26.3.2018)
4. Send meeting report to company. (28.3.2018)
5. Waiting WPLT report and checking piling and foundation.
6. Recommended foundation design for Tower 1 & 2. (7.6.2018)
7. Recommended Superstructure design for Tower 1 & 2 . (30.7.2018)
8. Remind to submit PLT report & comment for Tower 11 & 12. (26.11.2018)
9. Remind to submit PLT report & comment for Tower 11 & 12. (14.1.2019)
10. Remind to submit PLT report & comment for Tower 11 & 12. (9.4.2019)
11. Remind to submit PLT report for Tower 11&12. (13.5.2019)
12. Waiting PLT report for Tower 11 & 12.
Electrical 1. Presentation on (11.2.19).
2. Sent the comment on(25.2.19)
3. Sent the remind letter to submit the drawing on (25.3.19).
4. Sent the remind letter to submit the drawing on (29.4.19)
5. Submitted drawing on (13.5.19) (1) set.
6. Discuss with the National designer (24.5.19)
7. Discuss with the National designer (20.6.19)
8. Submitted drawing on (24.6.19) Report (4)sets.
ACMV 1. Presentation on (11.2.19).
2. Sent the comment on(25.2.19)
3. Sent the remind letter to submit the drawing on (25.3.19).
4. Sent the remind letter to submit the drawing on (29.4.19)
5. Submitted drawing on (13.5.19) (1) set.
6. Discuss with the National designer (24.5.19)
7. Discuss with the National designer (20.6.19)
8. Submitted drawing on (24.6.19) Report (4)sets.
Water and Sanitation 1. Presentation on (11.2.19).
2. Submit letter that company will obey CQHP’suggestions on (18.2.19).
3. Comment and recommended in principle.(25.2.19)
4. Reminder sent on (25.3.19).
5. Reminder sent on (29.4.19).
6. Submit Revised (4) set on (16.5.19).
6. Discuss with designer on (30.5.19)
7. Requirements to revise sent on (3.6.19).
8. Waiting for company’s reply.